Team Schedule:
01/06 Sun
(HANS) Establish fast, reliable, and modular serial comm with Arduino
01/07 Mon
Competition starts! Finalize strategy/design - ask questions/clarifications Search for robot parts (online? Amazon Prime!) Order extra parts!! (if required) Finalize component layout Build Pegbot (Bring home to test?) Build chassis Write test program/Prepare Computer Build motor controller Wire Arduino+motor controllers (carefully!)
01/08 Tue
Test on Pegbot CAD model parts Calibrate IR/Ultrasound/Webcam http://www.societyofrobots.com/sensors_interpret.shtml Plan out electrical design Map out the states
01/09 Wed
Finalize CAD model Start manufacturing/assembling parts for final robot (if possible) Build Mosfet controllers for non-PWMed motors Build Sensors (limit switches/encoders/IR http://www.societyofrobots.com/robotforum/index.php?topic=2712.msg32989#msg32989)
01/10 Thu
Begin building chassis (mind the lab/Machine shop hours) - Replan schedule (include chassis building schedule)
01/11 Fri
01/12 Sat
01/13 Sun
01/14 Mon
Mock 1
01/15 Tue
Finish chassis - move electronics on finalized chassis Recalibrate all sensors: IR, Ultrasound, Webcam, switches
01/16 Wed
01/17 Thu
01/18 Fri
Mock 2
01/19 Sat
01/20 Sun
01/21 Mon
Done with robot construction - now testing code Test Odometry - gather data and matlab model good baseline
01/22 Tue
01/23 Wed
01/24 Thu
Mock 3
01/25 Fri
01/26 Sat
01/27 Sun
01/28 Mon
01/29 Tue
Seeding
01/30 Wed
01/31 Thu
Robot impound (by 8PM)
02/01 Fri
Final Competition Win.