Team Fourteen/Journal
From Maslab 2014
(Difference between revisions)
(→Day 2) |
(→Day 2) |
||
Line 8: | Line 8: | ||
Got maple to run a program. *round of high fives* The problem was that we couldn't change the serial port, because maple was not being recognized by the tablet. Useful link here if you're having trouble: http://forums.leaflabs.com/topic.php?id=73#post-788. Completed most of the wiring for the kitbot. Later in the evening the whole team attended the solidworks workshop. | Got maple to run a program. *round of high fives* The problem was that we couldn't change the serial port, because maple was not being recognized by the tablet. Useful link here if you're having trouble: http://forums.leaflabs.com/topic.php?id=73#post-788. Completed most of the wiring for the kitbot. Later in the evening the whole team attended the solidworks workshop. | ||
+ | |||
+ | == '''Day 3''' == | ||
+ | |||
+ | Completed wiring for kitbot and got started on some solidworks sketches. |
Revision as of 18:28, 8 January 2014
Day 1
Productive things: shop training completed. Not so productive things: trying to get maple to work
Day 2
Got maple to run a program. *round of high fives* The problem was that we couldn't change the serial port, because maple was not being recognized by the tablet. Useful link here if you're having trouble: http://forums.leaflabs.com/topic.php?id=73#post-788. Completed most of the wiring for the kitbot. Later in the evening the whole team attended the solidworks workshop.
Day 3
Completed wiring for kitbot and got started on some solidworks sketches.