Team Nine/Journal

From Maslab 2014
(Difference between revisions)
Jump to: navigation, search
Line 9: Line 9:
 
Set up more stuff, started driving kitbot around.
 
Set up more stuff, started driving kitbot around.
  
=== Day 3 ==  
+
=== Day 3 ===
  
 
Keyboard control for the kitbot.  More CAD.
 
Keyboard control for the kitbot.  More CAD.

Revision as of 21:21, 11 January 2014

Contents

Week 1

Day 1

Set up stuff on the laptop: ubuntu and ROS.

Day 2

Set up more stuff, started driving kitbot around.

Day 3

Keyboard control for the kitbot. More CAD.

Day 4

Laser cut the roller assembly for testing. We had some scrap box extrusions for mounting the roller. Results were positive with a 3" diameter roller wheel 1" off the ground. We also got the IR sensors working and calibrated.

Day 5

A little machining work including adding a pin to the white geared motor to complete the front roller assembly and bending some sheet metal to test collecting the balls. Got ball following working for the checkoff.

Personal tools