Team Seventeen/Journal

From Maslab 2014
(Difference between revisions)
Jump to: navigation, search
(Week 1)
(Week 1)
Line 7: Line 7:
 
<b><big>1/7</big></b><br>
 
<b><big>1/7</big></b><br>
 
The battery and a USB cable for connecting to the Maple arrived.<br>
 
The battery and a USB cable for connecting to the Maple arrived.<br>
Forest assembled most of the wiring between the motors, motor controllers, and Maple, and tied everything down.<br>
+
Forest connected most of the wiring between the motors, motor controllers, and Maple, and tied everything down.<br>
 
Winter soldered the wires to the connecting pieces and to the motor.
 
Winter soldered the wires to the connecting pieces and to the motor.

Revision as of 19:37, 7 January 2014

Week 1

1/6
We got a set of Kitbot parts! (Minus the battery.)
Vinay and Winter worked on assembling the Kitbot frame, having some difficulty finding appropriately sized screws and nuts.
Forest worked on assembling the wheels and motors.

1/7
The battery and a USB cable for connecting to the Maple arrived.
Forest connected most of the wiring between the motors, motor controllers, and Maple, and tied everything down.
Winter soldered the wires to the connecting pieces and to the motor.

Personal tools