Team Seventeen/Journal

From Maslab 2014
Revision as of 19:36, 7 January 2014 by Ftong (Talk | contribs)
Jump to: navigation, search

Week 1

1/6
We got a set of Kitbot parts! (Minus the battery.)
Vinay and Winter worked on assembling the Kitbot frame, having some difficulty in finding the appropriate screws and nuts. Forest worked on assembling the wheels and motors.

1/7
Forest assembled most of the wiring between the motors, motor controllers, and Maple, and tied everything down.
Winter soldered the wires to the connecting pieces and to the motor.

Personal tools