Team Six/Journal
From Maslab 2015
(Difference between revisions)
(→Day 4, Jan 9) |
|||
Line 27: | Line 27: | ||
** Ultrasensor,motorcontroller, short IR, ultra short IR tested! | ** Ultrasensor,motorcontroller, short IR, ultra short IR tested! | ||
** All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor) | ** All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor) | ||
+ | |||
+ | == Day 5, Jan 10 == | ||
+ | **Board is still broken | ||
+ | ** Saturday!! We had pizza at the lab | ||
+ | ** We discuss the organization for the code. | ||
+ | ** Motor encoders tested and functional! | ||
+ | ** Wires are kinda organized | ||
+ | |||
+ | == Day 6, Jan 11 == | ||
+ | **Sunday. No Lab today. People coding alone. | ||
+ | ** Skeleton code! |
Revision as of 23:59, 11 January 2015
Contents |
Day 0, Jan 5
- Successfully located the third floor of the IDC building and created this wiki page.
- Set up our Edison board and created a playing field in Solidworks.
- Github repo created.
Day 1, Jan 6
- Members received shop training.
- Basic prototypes of ball collection mechanisms.
- Work with OpenCV
Day 2, Jan 7
- Everything is broken
- Board is broken
- Power Supply is broken
- Multimeter to test power supply is broken
- :(
Day 3, Jan 8
- Everything is still broken
- Test some sensors with an arduino.
- Create a makefile that can compile all code together
- Play with opencv
- Cads cads and prototype
Day 4, Jan 9
- Board is still broken
- Ultrasensor,motorcontroller, short IR, ultra short IR tested!
- All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor)
Day 5, Jan 10
- Board is still broken
- Saturday!! We had pizza at the lab
- We discuss the organization for the code.
- Motor encoders tested and functional!
- Wires are kinda organized
Day 6, Jan 11
- Sunday. No Lab today. People coding alone.
- Skeleton code!