Team Six/Journal

From Maslab 2015
(Difference between revisions)
Jump to: navigation, search
(Day 4, Jan 9)
Line 27: Line 27:
 
** Ultrasensor,motorcontroller, short IR, ultra short IR tested!
 
** Ultrasensor,motorcontroller, short IR, ultra short IR tested!
 
** All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor)
 
** All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor)
 +
 +
== Day 5, Jan 10 ==
 +
**Board is still broken
 +
** Saturday!!  We had pizza at the lab
 +
** We discuss the organization for the code.
 +
** Motor encoders tested and functional!
 +
** Wires are kinda organized
 +
 +
== Day 6, Jan 11 ==
 +
**Sunday. No Lab today. People coding alone.
 +
** Skeleton code!

Revision as of 23:59, 11 January 2015

Contents

Day 0, Jan 5

    • Successfully located the third floor of the IDC building and created this wiki page.
    • Set up our Edison board and created a playing field in Solidworks.
    • Github repo created.

Day 1, Jan 6

    • Members received shop training.
    • Basic prototypes of ball collection mechanisms.
    • Work with OpenCV

Day 2, Jan 7

    • Everything is broken
    • Board is broken
    • Power Supply is broken
    • Multimeter to test power supply is broken
    •  :(

Day 3, Jan 8

    • Everything is still broken
    • Test some sensors with an arduino.
    • Create a makefile that can compile all code together
    • Play with opencv
    • Cads cads and prototype

Day 4, Jan 9

    • Board is still broken
    • Ultrasensor,motorcontroller, short IR, ultra short IR tested!
    • All the wires are a mess. Lets try to standardize them. Red power, *black* ground, *Blue*/purple signal (Sensor ->Board) in, *white*/gray signal out (BOARD -> sensor)

Day 5, Jan 10

    • Board is still broken
    • Saturday!! We had pizza at the lab
    • We discuss the organization for the code.
    • Motor encoders tested and functional!
    • Wires are kinda organized

Day 6, Jan 11

    • Sunday. No Lab today. People coding alone.
    • Skeleton code!