Team One/Journal

From Maslab 2011

(Difference between revisions)
Jump to: navigation, search
Line 8: Line 8:
-Built the peg bot with two casters
-Built the peg bot with two casters
-Sent messages from the eeePC to Allen's laptop
-Sent messages from the eeePC to Allen's laptop
-
-
+
-Made robot drive forward to fulfill checkpoint 1

Revision as of 18:19, 4 January 2011

Day 0 (Jan 02):

-Discussion over Skype of strategy, organization and task allocation. (E,C,Al,M)

Day 1 (Jan 03):

-Lectures 0, 1 and 2 were attended. (C,Al,An) -Built the peg bot with two casters -Sent messages from the eeePC to Allen's laptop -Made robot drive forward to fulfill checkpoint 1

Personal tools