Team Six/Assignments
From Maslab 2011
(Difference between revisions)
(→Checkoff Three) |
(→Checkoff Two) |
||
Line 7: | Line 7: | ||
==Checkoff Two== | ==Checkoff Two== | ||
- | + | Journal, day 2, has our plans for our robot. | |
==Checkoff Three== | ==Checkoff Three== |
Revision as of 21:38, 7 January 2011
Contents |
Checkoff One
Repository has our Hello World program.
Checkoff Two
Journal, day 2, has our plans for our robot.
Checkoff Three
Repository has our IR Drive code.
Checkoff Four
Picture <coming soon>