(Wednesday January 5)
Line 31: Line 31:
L, C - attended lecture, troubleshooted and tested sensors (IR, gyro), worked through checkpoint 3
L, C - attended lecture, troubleshooted and tested sensors (IR, gyro), worked through checkpoint 3
-
L - assembled encoders
+
L - assembled encoders, planning to put them on pegbot tomorrow
S - worked on setting up software framework
S - worked on setting up software framework
-
C - got camera working with personal machine (thanks, staff!), configured ant, set up convenient routine for running robot remotely  
+
C - got camera working with personal machine (thanks, staff!), configured ant, set up convenient routine for running robot remotely
== Thursday January 6 ==
== Thursday January 6 ==

Revision as of 06:53, 6 January 2011

Contents

Legend

(L)eighton, (D)an, (S)tan, (C)athy

Pre IAP

Monday January 3

Today we attended lecture and then assembled our pegbot and got it driving. Trying to get a jump on the work ahead of us, we took pictures of the field and of the balls with our webcam for vision testing and started to wire up several IR sensors and a gyro.

Dan finalized 4-bar synthesis for the mechanism that raises the ball hopper up over the wall. He also figured out how everything will fit inside the robot's circular footprint.

Tuesday January 4

Dan got the majority of the detailed mechanical design finished.

Cathy tried to fix a problem with the v4l4j library by setting up a VM with Ubuntu 10,10 and a whole new dev environment on her machine, since certain camera functionality didn't work without v4l4j and v4l4j didn't work with her version of Ubuntu.

Cathy helped Stan and Leighton set up eclipse projects and git working directories.

Cathy, Stan and Leighton discussed software design.

Cathy went to get shop-trained.

Leighton rigged up some sensors.

Wednesday January 5

D - did more detailed CAD, set up files for rapid cutting, and created an assembly plan so we can start building this weekend.

L, C - attended lecture, troubleshooted and tested sensors (IR, gyro), worked through checkpoint 3

L - assembled encoders, planning to put them on pegbot tomorrow

S - worked on setting up software framework

C - got camera working with personal machine (thanks, staff!), configured ant, set up convenient routine for running robot remotely

Thursday January 6

Friday January 6