Day 1, Monday January 3

Today we attended lecture and then assembled our pegbot and got it driving. Trying to get a jump on the work ahead of us, we took pictures of the field and of the balls with our webcam for vision testing and started to wire up several IR sensors and a gyro.

Dan finalized 4-bar synthesis for the mechanism that raises the ball hopper up over the wall. He also figured out how everything will fit inside the robot's circular footprint.

Day 2, Tuesday January 4

Dan got the majority of the detailed mechanical design finished.

Cathy tried to fix a problem with the v4l4j library by setting up a VM with Ubuntu 10,10 and a whole new dev environment on her machine, since certain camera functionality didn't work without v4l4j and v4l4j didn't work with her version of Ubuntu.

Cathy helped Stan and Leighton set up eclipse projects and git working directories.

Cathy, Stan and Leighton discussed software design.

Cathy went to get shop-trained.

Leighton rigged up some sensors.

Day 3, Wednesday January 5

D - did more detailed CAD, set up files for rapid cutting, and created an assembly plan so we can start building this weekend.

L, C - attended lecture, troubleshooted and tested sensors (IR, gyro), worked through checkpoint 3

L - assembled encoders, planning to put them on pegbot tomorrow

S - worked on setting up software framework

C - got camera working with personal machine (thanks, staff!), configured ant, set up convenient routine for running robot remotely

Day 4, Thursday January 6

L, S, C - attended lecture

L - mounted encoders, wired up LED for debugging, helped debug checkpoint 4

S - continued working with software framework: main loop, state machine, sensor abstraction

C - wrote and tested a basic PID controller, worked on checkpoint 4, wrote some edge detection code

Day 5, Friday January 7

D, L, S, C - D got in last night, so we met to get him up to speed

D - measured components to make sure that they fit the mechanical design, made a prototype roller to test out functionality

L - wired up a controller for powering the roller's motor, helped C debug checkpoint 5

S - helped C debug checkpoint 5, worked on wall following code

C - worked on checkpoint 5, eventually got a PD controller running that tracks and approaches a red ball

Day 6, Saturday January 8

D battled with obstreperous machines and got everything cut.

L built a controller for our fourth motor, did other random electronics stuff, and built our very own field.

C started writing sensor classes and finished checkpoints 4 and 5.

S attacked wall-following.

Day 7, Sunday January 9

D machined hubs and didn't cut the hopper because he didn't have 1/16" Al.

D and L did post-processing on the cut materials and assembled the majority of the robot. Left to do is mounting the hopper.

C finished up sensor classes and wrote and tested color calibration code.

Day 8, Monday January 10

C wrote the checkpoint 6 code (button start, timing, color calibration) and wrote the ball picking up code in preparation for the mock competition.

S finished some classes for velocity control and wall following (still untested).

L mounted the buttons to start the robot for the mock competitions.

C, L and S debugged the robot at the mock competition. Then we won the mock competition!

C, S divided up the rest of the software areas.

Day 9, Tuesday January 11

L wired up limit switches and bump sensors and prototyped the break-beam sensor.

D cut and installed the hopper and worked on the ball intake ramp.

S debugged wall-following control.

C wrote software to optimize image processing.

Day 10, Wednesday January 12

C got most of the rest of the vision work done, including smoothing, down-sampling, and worked on blue-line filtering.

S managed to get real-time parameter updating working! and succeeded with wall-following.

L did lots of wiring, installed break beam sensor, defined I/O ports, got the roller motor PWM circuit going.

D installed curved ball guide, wired up the new battery pack, and tweaked various things on the robot.

Day 11, Thursday January 13

stan

Day 12, Friday January 14

cathy

Day 13, Saturday January 15

leighton

Day 14, Sunday January 16

dan

Day 15, Monday January 17

stan

Day 16, Tuesday January 18

cathy

Day 17, Wednesday January 19

leighton

Day 18, Thursday January 20

dan

Day 19, Friday January 21

stan

Day 20, Saturday January 22

cathy

Day 21, Thursday January 23

leighton

Day 22, Friday January 24

dan

Day 23, Saturday January 25

stan

Day 24, Sunday January 26

cathy