Bowler came in with basic red-ball-tracking openCV code that slowed to an unusable crawl (<1 fps) as soon as we tried it on the acer netbook. Need to optimize. At any rate, everything on the software end is all configured now.

Lesman came in with a sexy CAD design, did most of the pegbot assembling, and is working on custom Arduino firmware.

Jorge did most of the wiring and soldering, only blowing out one voltage regulator in the process. (Thanks to this incident, the contest admins now have the correct spec sheet uploaded to the wiki.)

We got through two checkoffs on the first day, so we're making good time so far.