Team Ten/Journal

From Maslab 2014
Revision as of 02:12, 7 January 2014 by Dcbarnes (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Captains log 1/6/14

The sky was stormy and team morale was bleak. Three team members made it to class on time, the last was 5 minutes late due to travel and the icy pavement that has invaded the fair town of Boston. Team met at 12 PM to begin creating kitbot. Team worked on kitbot and finished all mechanical construction. It was decided to leave the electrical work until tomorrow since the necessary batteries were not yet here. Team then left to do other activities. The team then later reconvened to discuss strategy.

Personal tools