Team Four/Assignments
From Maslab 2015
(Difference between revisions)
Team4 15 (Talk | contribs)
(Created page with "== Goals/Checkpoints == *Kitbot fully operational ✓ *Assembled test stacking tower ✓ *Got OpenCV identifying blocks ✓ *LC Servo grabber *Manufacture and print hinged tower...")
Newer edit →
(Created page with "== Goals/Checkpoints == *Kitbot fully operational ✓ *Assembled test stacking tower ✓ *Got OpenCV identifying blocks ✓ *LC Servo grabber *Manufacture and print hinged tower...")
Newer edit →
Revision as of 15:36, 12 January 2015
Goals/Checkpoints
- Kitbot fully operational ✓
- Assembled test stacking tower ✓
- Got OpenCV identifying blocks ✓
- LC Servo grabber
- Manufacture and print hinged tower
- CAD full lift design
- Manufacture and print prototype block lift
- CAD overall layout.
- Clean up code