Team Four/Assignments

From Maslab 2015
Revision as of 15:36, 12 January 2015 by Team4 15 (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Goals/Checkpoints

  • Kitbot fully operational ✓
  • Assembled test stacking tower ✓
  • Got OpenCV identifying blocks ✓
  • LC Servo grabber
  • Manufacture and print hinged tower
  • CAD full lift design
  • Manufacture and print prototype block lift
  • CAD overall layout.
  • Clean up code
Personal tools