Team Schedule:
 
Team Schedule:
  
01/06 Sun   (HANS) Establish fast, reliable, and modular serial comm with Arduino
+
01/06 Sun
01/07 Mon    Competition starts!
+
        Finalize strategy/design - ask questions/clarifications
+
  
Search for robot parts (online?  Amazon Prime!)
+
(HANS) Establish fast, reliable, and modular serial comm with Arduino
        Order extra parts!! (if required)
+
  
CAD model parts
 
  
Finalize component layout
+
01/07 Mon
 
+
Plan out electrical design
+
 
+
TEST ALL COMPONENTS!!
+
  
 +
Competition starts!
 +
Finalize strategy/design - ask questions/clarifications
 +
Search for robot parts (online?  Amazon Prime!)
 +
Order extra parts!! (if required)
 +
Finalize component layout
 
Build Pegbot (Bring home to test?)
 
Build Pegbot (Bring home to test?)
            Build chassis
+
Build chassis
 
+
 
Write test program/Prepare Computer
 
Write test program/Prepare Computer
            Build motor controller
+
Build motor controller
            Wire Arduino+motor controllers (carefully!)
+
Wire Arduino+motor controllers (carefully!)
        Decide on specifications:
+
            - units!
+
        Map out the states
+
01/08 Tue    Test on Pegbot
+
  
        Calibrate IR/Ultrasound/Webcam http://www.societyofrobots.com/sensors_interpret.shtml
+
01/08 Tue
  
        Continue CADding
+
Test on Pegbot
 +
CAD model parts
 +
Calibrate IR/Ultrasound/Webcam http://www.societyofrobots.com/sensors_interpret.shtml
 +
Plan out electrical design
 +
Map out the states
  
        Start manufacturing/assembling parts for final robot (if possible)
+
01/09 Wed
01/09 Wed   Finalize CAD model
+
  
 +
Finalize CAD model
 +
Start manufacturing/assembling parts for final robot (if possible)
 
Build Mosfet controllers for non-PWMed motors
 
Build Mosfet controllers for non-PWMed motors
        Build Sensors (limit switches/encoders/IR http://www.societyofrobots.com/robotforum/index.php?topic=2712.msg32989#msg32989)
+
Build Sensors (limit switches/encoders/IR http://www.societyofrobots.com/robotforum/index.php?topic=2712.msg32989#msg32989)
01/10 Thu    Begin building chassis (mind the lab/Machine shop hours) -
+
  
 +
01/10 Thu
 +
 +
Begin building chassis (mind the lab/Machine shop hours) -
 
Replan schedule (include chassis building schedule)
 
Replan schedule (include chassis building schedule)
 +
 
01/11 Fri   
 
01/11 Fri   
 +
 
01/12 Sat   
 
01/12 Sat   
 +
 
01/13 Sun   
 
01/13 Sun   
 
        
 
        
01/14 Mon   Mock 1
+
01/14 Mon
01/15 Tue   Finish chassis - move electronics on finalized chassis
+
 
        Recalibrate all sensors: IR, Ultrasound, Webcam, switches
+
Mock 1
 +
 
 +
01/15 Tue
 +
 
 +
Finish chassis - move electronics on finalized chassis
 +
Recalibrate all sensors: IR, Ultrasound, Webcam, switches
 +
 
 
01/16 Wed   
 
01/16 Wed   
 +
 
01/17 Thu   
 
01/17 Thu   
  
01/18 Fri     Mock 2
+
01/18 Fri
 +
 
 +
Mock 2
 +
 
 
01/19 Sat   
 
01/19 Sat   
 +
 
01/20 Sun   
 
01/20 Sun   
01/21 Mon   Done with robot construction - now testing code
+
 
        Test Odometry - gather data and matlab model good baseline
+
01/21 Mon
 +
 
 +
Done with robot construction - now testing code
 +
Test Odometry - gather data and matlab model good baseline
 +
 
 
01/22 Tue   
 
01/22 Tue   
 +
 
01/23 Wed   
 
01/23 Wed   
 
        
 
        
01/24 Thu     Mock 3
+
01/24 Thu
 +
 
 +
Mock 3
 +
 
 
01/25 Fri   
 
01/25 Fri   
 +
 
01/26 Sat   
 
01/26 Sat   
 +
 
01/27 Sun   
 
01/27 Sun   
 +
 
01/28 Mon   
 
01/28 Mon   
  
01/29 Tue   Seeding
+
01/29 Tue
 +
 
 +
Seeding
 +
 
 
01/30 Wed   
 
01/30 Wed   
 
        
 
        
01/31 Thu   Robot impound (by 8PM)
+
01/31 Thu
02/01 Fri   Final Competition
+
 
        Win.
+
Robot impound (by 8PM)
+
 
 +
02/01 Fri
 +
 
 +
Final Competition
 +
Win.

Latest revision as of 22:52, 8 January 2013

Team Schedule:

01/06 Sun

(HANS) Establish fast, reliable, and modular serial comm with Arduino


01/07 Mon

Competition starts! Finalize strategy/design - ask questions/clarifications Search for robot parts (online? Amazon Prime!) Order extra parts!! (if required) Finalize component layout Build Pegbot (Bring home to test?) Build chassis Write test program/Prepare Computer Build motor controller Wire Arduino+motor controllers (carefully!)

01/08 Tue

Test on Pegbot CAD model parts Calibrate IR/Ultrasound/Webcam http://www.societyofrobots.com/sensors_interpret.shtml Plan out electrical design Map out the states

01/09 Wed

Finalize CAD model Start manufacturing/assembling parts for final robot (if possible) Build Mosfet controllers for non-PWMed motors Build Sensors (limit switches/encoders/IR http://www.societyofrobots.com/robotforum/index.php?topic=2712.msg32989#msg32989)

01/10 Thu

Begin building chassis (mind the lab/Machine shop hours) - Replan schedule (include chassis building schedule)

01/11 Fri

01/12 Sat

01/13 Sun

01/14 Mon

Mock 1

01/15 Tue

Finish chassis - move electronics on finalized chassis Recalibrate all sensors: IR, Ultrasound, Webcam, switches

01/16 Wed

01/17 Thu

01/18 Fri

Mock 2

01/19 Sat

01/20 Sun

01/21 Mon

Done with robot construction - now testing code Test Odometry - gather data and matlab model good baseline

01/22 Tue

01/23 Wed

01/24 Thu

Mock 3

01/25 Fri

01/26 Sat

01/27 Sun

01/28 Mon

01/29 Tue

Seeding

01/30 Wed

01/31 Thu

Robot impound (by 8PM)

02/01 Fri

Final Competition Win.